Alderley Group Singapore
Specialist local support for the FPSO and marine sectors in South East Asia
FPSO and Marine
Lightweight
Ensuring fit within the existing space and weight limitations of an FPSO and overcoming obsolete equipment
Fully compliant
Delivering enhanced performance solutions to meet current requirements. Hazardous Area and IECEx compliant
Flexible
Our dynamic team of technicians can fully support your requirements, whether inspection or maintenance during pre-planned shutdowns
Local support
Utilising local resources to supply and implement the most cost effective solution to the highest quality
Integrated energy solutions
Local facilities
Local Alderley Group experts working with our strategic partners,
TOM Engineering, for local project delivery
Alderley Singapore
c/o TOM Group of Companies
13 Tuas South Street 3
Tuas
638019
Singapore
Facility 1
Office Area: 1200m²
Covered Stores: 1200m²
Uncovered Stores: 2000m²
Workshop Area: 4500m²
Consisting of: Covered workshop for fabrication, assembly and testing area 4400m². Packing Area: 100m²
Local strategic partner: TOM engineering
Facility 2
Office Area: 900m²
Covered Stores: 1400m²
Uncovered Stores: 1800m²
Workshop Area: 4400m²
Consisting of: Covered workshop for fabrication, assembly and testing area 4300m². NDE area: 100m²
Recent projects
Specialist and rapid-turnaround redeployment solutions

FPSO redeployment
Converting and extending the life of an existing vessel within Singapore – refurbishing and commissioning the vessel’s cargo valve control system within a tight deadline.
With the old systems being manufactured in 1991, there were several complexities in upgrading them to meet current requirements, such as delivering an enhanced performance while ensuring fit with the existing space and weight limitations.
Overcoming the challenge of parts obsolescence, our procurement team worked closely with our global supply chain to identify the best quality substitutes at the most competitive price
Utilising our specialist FPSO Project Team, in conjunction with our local resource partners in Singapore and back-office engineering team in the UK, we were able to effectively generate a detailed inspection report, followed by:
- A full turnkey solution; comprising of design, engineering, project management
- Component supply, upgrade and refurbishment
- Installation and commissioning - completed safely and securely during the COVID-19 pandemic